Process
Five steps, every project.
You should know what happens next before you sign anything. How long each step takes depends on the job, and a kitchen and a vanity are not the same project.
Step one
Consultation in your home
Half an hour to an hour, no charge. We measure, look at how you use the room, and talk about budget before anyone draws anything.
Step two
Design and fixed proposal
Measured drawings and 3D views, plus species and finish samples in your hand. You get one number, with time to look it over and ask questions.
Step three
Built in our shop
This is the long part. Every piece for the job is cut at once on our CNC, then the cabinets are assembled one at a time. Face frames, doors, shelves, and dovetailed drawers are each made separately, and the painted parts are sprayed and left to cure between coats before everything is put together.
Step four
Install
Floor protection down, dust control up, and a crew that cleans the site every evening. A kitchen takes a couple of weeks; a vanity or a built-in is usually about a week.
Step five
Punch list and handover
We walk the room with you and adjust every door and drawer. Anything that needs a second visit gets one.
How long it takes
No two jobs run the same schedule. Everything we build is made for one room, so we schedule around the work rather than a template. The size of the run, the wood, the details, and what else is happening in the house all move the dates. The spans below are what similar projects have taken, counted from the day you sign the drawings. They cover the whole process, meaning design, shop time and install. It is not time spent in your house. Most of it happens at our shop while you go about your life. The only stretch your room is out of commission is the install itself.
Kitchens
3 – 4 months
The longest job we do. Design and approvals take weeks on their own, and the shop time scales with the size of the run.
Baths & vanities
3 – 6 weeks
Fewer pieces and a shorter install, so a vanity moves through the shop well ahead of a kitchen.
Built-ins & millwork
3 – 8 weeks
One unit, one room. Most of the schedule is shop time; install is usually about a week.
One-off pieces
2 – 6 weeks
A mantel, a single cabinet, a deck. Depends entirely on the piece and where it lands in the shop queue.
What we ask of you
Decisions on time and honest answers about budget. We handle permits, delivery coordination, and the electrician's schedule.
What you can count on
A fixed price before we cut anything, a dated schedule, one point of contact, and a shop that cleans up every day.
Pages
- Custom Kitchen Remodeling & Cabinetry in CT
- Portfolio: Custom Kitchens & Built-ins in CT
- Custom Cabinetry, Kitchens, Baths & Built-ins
- How a Custom Cabinet Project Runs, Step by Step
- Book a Free In-Home Consultation
- Solid Cherry Cabinetry, Whole House in Madison, CT
- Painted Shaker Kitchen Remodel in Madison, CT
- Natural Maple Kitchen Remodel in Clinton, CT
- Custom Bay Window Seat in Killingworth, CT
- Single Custom Built-in Cabinet in Westbrook, CT
- Custom Mantel & Quartz Hearth, Madison CT
- Arched Wine Window for Drea's, Branford CT
- Custom Deck Built on Rock Ledge in Connecticut